The following is a schedule with one pump and two sequences. The first sequence is a pulse irrigation:
When the schedule is paused during the first pulse, the pump stops first, followed by the valves.
When the schedule is resumed the valves resume first, followed by the pump.
When the schedule is paused between the pulses, the next pulse is delayed for the pause duration.