From the Welcome page, click on 'Schedule' to go to the Schedule Overview:
In the Schedule Overview, click on the 'New schedule' button:
This will take you to the Schedule Editor:
You can rename the schedule to something more appropriate:
You can set a date and time to start the schedule automatically:
Alternatively, if you don't want the schedule to begin automatically, you can select it to be user activated. This will allow you to start it on-demand at any time:
Items can be added from the equipment list on the left using the '+' button. Alternatively, click on the asset shape on the map to add it from the map view.
Add Pumps or any other items that need to run for the duration of the whole schedule in the 'P1' sequence:
After the pump is added, the selector will move automatically to Sequence 1. If you'd like to add another pump, simply click on 'P2' and add the second pump.
Add the other items (valves/bays/gates) in the order in which you want them to open in Sequence 1:
Click on the item to change the runtime:
You can also delay the start of the first item by clicking on 'Start at beginning of schedule' and changing the option:
The Sequence settings allows you to increase or decrease the runtime of all the items in the sequence at the same time.
You can also commence each item before the previous item finishes.
Or add a dwell time or interval between each item.
The runtime and start time offset can be overridden for each individual item by clicking on it in the Sequence:
Here, for example, we have an irrigation schedule where Valves 1, 2 and 3 will each run for 1 hour, with Valves 2 and 3 opening 5 minutes before the previous valve closes. Then there will be a dwell time of 15 min after which Valves 1, 2 and 3 will each run for 1 hour.
You can also schedule multiple sequences to run at the same time.
After you are happy with your schedule, click Save.